The Tower tools and reference
Inner Land Mines Cooldown
Inner Land Mines Cooldown runs 15 stone levels, from 200s to 50s, and costs 1,800 stones. Each row is one level with its cost, absolute change, and percent change.
The Tower tools and reference
Inner Land Mines Cooldown runs 15 stone levels, from 200s to 50s, and costs 1,800 stones. Each row is one level with its cost, absolute change, and percent change.
Towerstats.org
Reading locally saved reports. Large histories can take a moment.